Techoration - Technology & Decoration in Perfect Synergy

PEDIGREE OUTDOORt.png

PORTFOLIO

Date of Installation - June 2021

Requirement


Level the area, dig and install a pond with U/V and partical filter circulation system to cascade down a stone waterfall, to be deep enough for Koi Karp and to grass the surrounding area with a new walkway.

Total time to finish the works: 3-weeks

Click HERE to see the before, during and finished images

Date of Installation - October 2021

Requirement


Remove the existing natural grass and replace with good quality artificial grass including levelling the ground, caping the irrigation and removing some trees and shrubs.

Total time to finish the works: 4-days

Click HERE to see the before, during and finished images

e5ce0aa9-c8ee-4431-8ed8-e259ed2d279a
e5ce0aa9-c8ee-4431-8ed8-e259ed2d279a

press to zoom
bcc9c810-f195-4578-b614-913cfffc1f21-1
bcc9c810-f195-4578-b614-913cfffc1f21-1

press to zoom
6f9dfe32-6e46-4e9d-8265-c5411bce06ad-1
6f9dfe32-6e46-4e9d-8265-c5411bce06ad-1

press to zoom
e5ce0aa9-c8ee-4431-8ed8-e259ed2d279a
e5ce0aa9-c8ee-4431-8ed8-e259ed2d279a

press to zoom
1/5